🛫 The building of the Boeing 777 was a complex project that took 10,000 people nearly five years to complete, costing five billion dollars.
🔧 The plane underwent extensive testing and had to meet strict technical standards to ensure safety. Any technical issues could put lives at risk.
🌍 The building of the 777 happened during a recession in the airline industry. If the plane failed, Boeing's future could be in jeopardy.
🔍 Engine tests simulate normal and abnormal flight conditions, including birdstrikes and extreme weather.
⚙️ Regular cycles of engine activity reveal problems related to fatigue and vibration, allowing for necessary repairs.
🛠️ Engine design improvements aim to reduce maintenance errors and increase reliability, with the use of ground and flight tests.
🛩️ The decision to use a flying test bed for engine testing was debated, but ultimately chosen as a part of the development program for the Boeing 777.
🔥 During engine test flights, a surge occurred, causing a dramatic explosion and disrupting the airflow through the engine.
🛠️ The cause of the surge was identified as inadequate stiffness in the case surrounding the fan blades, leading to blade stalling.
💡 The Boeing 777 fuselage had to withstand high-pressure conditions of 12.1 psi without leaking.
✈️ A temporary fix was implemented to seal a defective door and the plane successfully reached 12.1 psi without leaking.
🛫 Boeing engineers built a simulator called Legos to address handling problems of a future stretched version of the plane.
💥 During a test, an explosive bolt snapped off the fan blade, demonstrating the need to increase the wall thickness of the engine case.
🛠️ The Flanagan Brothers were tasked with machining a stronger turbine case for the Boeing 777 and successfully reduced the weight by 90%.
⏰ The engine issues caused a delay in delivering the engines on time, resulting in stress and disruptions for Pratt & Whitney and Boeing.
✈️ The first Boeing 777 was unveiled at a roll out ceremony attended by thousands of employees and their relatives.
🌬️ The plane had a hydraulic leak that needed to be fixed before it could taxi for the high-speed test.
🛬 The test also involved checking the plane's response to crosswinds and inducing shimmy on the nose landing gear.
💡 The Boeing 777 prototype undergoes taxi tests to check the landing gear, brakes, and stability.
🔧 A minor issue with a rubber o-ring causing a hydraulic fluid leak is discovered and fixed.
✈️ The next day, the prototype is scheduled for its first flight, marking a significant milestone.
Funzione Scegli - Excel Facile
Communication Tips for Performance Reviews: What to Say in Your Performance Review
This Country Runs on 98 Percent Renewable Electricity | Ramón Méndez Galain | TED
ESP32 tutorial B-11: Bluetooth control with your Android app
The Absurd Business of Being an Internet Prankster (Max Fosh)
Staying Ahead in Tech: Why One-Dimensional Careers Won't Last in the AI Evolution Era